More views of the Waterworld! 2013! project.

7 Apr

I guess I couldn’t face taking pictures of everything all at once. Here are some more photos of the damage and the repairs. All this plastic piping is new, replacing old cast iron stuff.

In other news, I managed to change the fill valve on the top floor toilet, so that’s not running anymore. However, the ground floor toilet is not flushing, so i can’t use that one (and the 3rd floor is disconnected), so I now have to go up to the fourth floor (or ask one of my neighbors) any time I want to use the loo…. Hopefully, that’s just for one more day as the guys are back tomorrow to start the wall/floor/ceiling repairs (and fix the freakin’ toilet).

More new pipes.

More new pipes.

New pipes.

New pipes.

Nasty ass dirt floor and sewer stuff.

Nasty ass dirt floor and sewer stuff.

Another in the broken pipe series. So gritty, so real.

Another in the broken pipe series. So gritty, so real.

View of water damage and new electrical at head of basement stairs.

View of water damage and new electrical at head of basement stairs.

2 Responses to “More views of the Waterworld! 2013! project.”

  1. Kris April 9, 2013 at 2:37 pm #

    Now I am worrying about our pipes too…

    • Erica Walch April 10, 2013 at 6:23 pm #

      Well, I hope yours are fine. Maybe they’re already replaced with PVC — your house seemed to have been more 20th century than mine — My house kind of skipped the 20th century altogether:)

Leave a reply to Kris Cancel reply