The final stretch.

16 Mar

The plumber was here late last night doing some final plumbing thing with the tub drain. I was out all day, but Jay and Keith finished almost all of the tiling — there is one last row of tile to put up in the toilet enclosure. I’m guessing they ran out of pieces. They say they’ll be back tomorrow to finish tiling and grouting. Which I hope also means hooking up the toilet and installing the sink. And as soon as they are done, I will begin cleaning with a vengeance — and I just hope to God that they are done at a reasonable hour, because their early and my early are not the same concept. Maybe I’ll just go to the St. Patrick’s Day parade if they’re not done soon enough for me to clean.

Here are today’s photos:

Here's how the funky shelf-tub support turned out. I like it!

Here’s how the funky shelf-tub support turned out. I like it!

Light installed over where the sink will go sometime.

Light installed over where the sink will go sometime.

The shower head is hooked up.

The shower head is hooked up.

The toilet area is ALMOST finished being tiled. Just that one final row of trim that didnt get done.

The toilet area is ALMOST finished being tiled. Just that one final row of trim that didnt get done.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: