Bathroom progress: A lot!

11 Mar

When I came home today and peeked my head into the bathroom, I saw lots of changes! The tub is basically installed (minus the water part) and all the walls are up and the floor is back. Yay! It’s a major leap forward. The plumber is going to come tomorrow and hook things up and then the tiling is due to start on Wednesday, so that should take Wednesday and Thursday and have the bathroom done on Friday. It is going to look amazing!

View of tub and walls.

View of tub and walls.

Toilet containment unit/throne room.

Toilet containment unit/throne room.

There's going to be a neat little ledge here when the tiling is done.

There’s going to be a neat little ledge here when the tiling is done.

Spooky shot of toilet in hallway, awaiting installation.

Spooky shot of toilet in hallway, awaiting installation.

Bathroom progress (with dogs)

Bathroom progress (with dogs)

Advertisements

One Response to “Bathroom progress: A lot!”

  1. Danielle March 11, 2013 at 10:31 pm #

    I love the Dunkins cups in the “throne” area – cracked me up!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: